A Ehrwalder Almbahn
closed in preparation open
B 6er Ganghofer
closed in preparation open
C 6er Gaistal
closed in preparation open
D 6er Issental
closed in preparation open
E Hochbrand
closed in preparation open
F Klämmli
closed in preparation open
G Mini
closed in preparation open
H Kinderland
closed in preparation open
Tirolerhaus
closed in preparation open

8er-Cabin "Ehrwalder Almbahn"

8er-Cabin "Ehrwalder Almbahn"

  
Built2001
opened on15.12.2001
Cable height at the valley station1.115,20 m
Cable height at the mountain station 1.508,70 m
Altitude difference 393,50 m
Horizontal track length2.238,75 m
Operating length (diagonal length) 2.275,27 m
Central incline 17,58 %
Maximum incline38,00 %
Number of pylons 17
Track width5,20 m
Method of travel 
Number of cabins99
Capacity8 Personen
Optimum load 640 kg
Distance between cabins51,43 m
Operating Process 
Nominal speed5 m/sec.
Time between cabins 10,29 sec.
Fastest travel time 7,58 min
Capacity 2.800 Pers./h
Power capacity720 kW

6 Pers. Chairlift "Ganghofer Blitz"

6 Pers. Chairlift "Ganghofer Blitz"

  
Built1996
Cable height at the valley station1.279,50 m 
Cable height at the mountain station1.694,50
Altitude difference415 m
Horizontal track length1.582 m 
Operating length (diagonal length)1.640,76 m
Central incline26,23 %
Maximum incline60,00 %
Number of Pylons13
Track width5,50 m
Method of travel 
Number of chairs78
Optimum load480 kg
Distance between chairs45 m
Nominal speed5 m/sec.
Time between chairs11,25 sec.
Capacity2.400 Pers./h
Power capacity560 kW
Cable diameter43 mm

6 pers. Chairlift "Gaistal"

6 pers. Chairlift "Gaistal"

  
Built2007, opened on 01.12.2007
Cable height at the valley station1.527,20 m
Cable height at the mountain station1.871,20 m
Altitude difference344,0 m
Horizontal track length1.173,50 m
Operating length (diagonal length)1.241,40 m
Central incline29,3 %
Maximum incline79 %
Number of pylons15, davon eine Zweifachstütze
Track width6,1 m
Method of travel  
Number of chairs70
Nominal capacity480 kg
Distance between chairs38,57 m
Method of transport 
Nominal speed5 m/sec.
Time between chairs7,71 sec.
Fastest travel time4,52 min
Capacity2.800 Pers/h
Power capacity500 kW
Cable diameter45 mm

6 pers. Chairlift "Issentalkopf"

6 pers. Chairlift "Issentalkopf"

  
Built2014
Cable height at the valley station1.485 m
Cable height at the mountain station1.923 m
Altitude difference440 m
Length1.306 m
Number of Pylons13
Number of chairs80
Nominal speed5 m/sec.
Capacity2.880 Pers/h
Cable diameter48 mm

Drag lift "Hochbrand"

Drag lift "Hochbrand"

  
Built1974
Cable height at the valley station1.421 m
Cable height at the mountain station1.694 m
Altitude difference273 m
Length805 m
Nominal speed3,2 m/sec.
Capacity1.300 Pers/h

Drag lift "Klämmli"

Drag lift "Klämmli"

  
Built1976
Cable height at the valley station1.500 m
Cable height at the mountain station1.603 m
Altitude difference103 m
Length486 m
Nominal speed3 m/sec.
Capacity1.200 Pers/h

Impounding reservoir

Impounding reservoir

  
Built2008
Total capacity70.000 m³
Water area11.600 m²
Height of embankment1.466 m
Reservoir length320 m
Reservoir width4 m
Maximum water level1.465 m
Freeboard1 m
Deepest point of reservoir1.455 m (tiefster Punkt)
Maximum storage height10 m
Maximum reservoir height14 m
Total area of reservoir incl. embankment23.000 m² (inkl. Böschungen)